Skip Navigation LinksARC858 ARC 858

  • Extremely abrasion resistant
    • Extends equipment lifetime  
    • Reduces spare parts
    • Reduces downtime
  • High build - single coat applications
    • Quick applications
  • High adhesive strength
    • Provides long-term protection
    • Eliminates under-film corrosion
  • 100% solids; no VOCs; no free isocyanates
    • Enhances safe use
    • No shrinkage on cure
    • Resists permeation​​​​
 
Pump casings
Heat exchangers
Pipe elbows
Impellers and blades
Bins and silos
Tanks and vessels
Back plates
Hoppers
Valves
Wear plates
Transport screws
Dewatering screws​
Click Here for Foreign Language Literature

 

 

ARC Chemical Resistance Chart for Metal https://arcindustrialcoatings.chesterton.com/ArcDocuments/ARC_Chemical_Resistance_Chart_Metal_Coatings.pdfARC Chemical Resistance Chart for Metal
Application Instructions - ARC 858 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/AI_858_EN.pdfApplication Instructions - ARC 858 (English)
Application Instructions: ARC 858(E) - (English) - Available in EMEA Only (pdf)https://arcindustrialcoatings.chesterton.com/ArcDocuments/AI_ARC 858(E)_EN_09-2018.pdfApplication Instructions: ARC 858(E) - (English) - Available in EMEA Only (pdf)
Product Datasheet: ARC 858(E) - (English) - Available in EMEA Only (pdf)https://arcindustrialcoatings.chesterton.com/ArcDocuments/PDS_ARC 858(E)_EN_11-2018.pdfProduct Datasheet: ARC 858(E) - (English) - Available in EMEA Only (pdf)
SDS Part A - ARC 858(E) - (English) - Available in EMEA Only (pdf)https://arcindustrialcoatings.chesterton.com/ArcDocuments/SDS_ARC 858(E) Part A-EN.pdfSDS Part A - ARC 858(E) - (English) - Available in EMEA Only (pdf)

Click Here for Foreign Language Literature

 

 

Success Stories - Use of Protective Coatings in Mining (e-book)https://arcindustrialcoatings.chesterton.com/ArcDocuments/36586_Protective Coating_Mining_CS_eBook-FINAL.pdfSuccess Stories - Use of Protective Coatings in Mining (e-book)
ARC Case Study 021: Mining Industry - Pump Repairhttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23593.20_ARC-CS021_MINING-MINERAL-ORE-PROCESSING_EXTRACTING-MINING-DEWATERING-PUMP.pdfARC Case Study 021: Mining Industry - Pump Repair
ARC Case Study 012: Nuclear Power Industry - Water Pump Impellershttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23593.11_ARC-CS012_POWER-NUCLEAR_SEAWATER-PUMP-IMPELLER.pdfARC Case Study 012: Nuclear Power Industry - Water Pump Impellers
ARC Case Study 042: Mineral Processing - Butterfly Valvehttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23593.41_ARC-CS042_MINING-MINERAL-ORE-PROCESSING-REFINING_BUTTERFLY-VALVE.pdfARC Case Study 042: Mineral Processing - Butterfly Valve
ARC Case Study 007: Food & Beverage/Pump Repairhttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23593.03_ARC-CS007_FOOD-BEVERAGE-SUGAR-MILL_COOLING-WATER-PUMPS.pdfARC Case Study 007: Food & Beverage/Pump Repair

Nominal, based on a 750 µm (30 mil) thickness

  • 250 g kit covers 0.20 m2(2.21 ft2)
  • 940 ml cartridge covers 1.25 m2 (13.50 ft2)
  • 0.75 liter kit covers 1.00 m2 (10.6 ft2)
  • 1.5 liter kit covers 2.00 m2 (21.53 ft2)
  • 5 liter kit covers 6.67 m2 (71.76 ft2)
  • 16 liter kit covers 21.33 m2 (229.63 ft2)
     
    Note: Components are pre-measured and pre-weighed. ​
    ​Each kit includes mixing and application instructions. ​250 g, 940 ml, 0.75 liter, 1.5 liter, and 5 liter kits include tools.

Available Colors

Gray