Skip Navigation LinksARCBX5 ARC BX5

  • Rapid cure chemistry
    • Quick return to service
  • High volumetric loading level of ceramics
    • Resists abrasive wear longer
  • Surface tolerant formulation
    • Bonds to moist and suboptimally prepared substrates
  • 100% solids; no VOCs; no free isocyanates
    • Enhances safe use
  • Mechanically tough reinforced composite
    • ​Resist mild to moderate impact applications​​
​Pneumatic conveyors
Ni-hard slurry pumps
Cyclones and hoppers
Chipper and chip bins
Fly ash separators
Wear plates
Hydro pulpers
Tran​​sport fans
Pipe elbows
Turbo separators
Screw conveyors
Pulverizers
Click Here for Foreign Language Literature

 

 

Product Datasheet: ARC BX5 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/EN84963_ARC_BX5_PDS.pdfProduct Datasheet: ARC BX5 (English)
Application Instructions: ARC BX5 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/085028_ARC_BX5_AI_EN.pdfApplication Instructions: ARC BX5 (English)
SDS (Part A) - ARC BX2/BX5 RD/GY (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/asBX2A_BX5A_EN.pdfSDS (Part A) - ARC BX2/BX5 RD/GY (English)
SDS (Part B) - ARC BX5 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/asBX5B_EN.pdfSDS (Part B) - ARC BX5 (English)
ARC Chemical Resistance Chart for Metal https://arcindustrialcoatings.chesterton.com/ArcDocuments/ARC_Chemical_Resistance_Chart_Metal_Coatings.pdfARC Chemical Resistance Chart for Metal

Click Here for Foreign Language Literature

 

 

WORLD COAL 2012: "The Use of Advanced Epoxy Composite Linings in Coal Handling and Preparation Plants."https://arcindustrialcoatings.chesterton.com/ArcDocuments/The_Use_of_Advanced_Epoxy_Composite_Linings_Coal_Handling_Preparation_Plants_World_Coal_2012.pdfWORLD COAL 2012: "The Use of Advanced Epoxy Composite Linings in Coal Handling and Preparation Plants."
ARC Case Study 026 - Mineral-Ore - Coal Chutehttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23593.25_ARC-CS026_MINING-MINERAL-ORE-PROCESSING-BENEFICIATION_COAL-CHUTE-_SQUARE-TO-_ROUND-TRANSITION.pdfARC Case Study 026 - Mineral-Ore - Coal Chute
ARC Case Study 127 - Mineral-Ore - Screen Discharge Chutehttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23606.22_ARC_CS127_MINING-MINERAL-ORE-PROCESSING_BENEFICIATION_SCREEN-DISCHARGE-CHUTE.pdfARC Case Study 127 - Mineral-Ore - Screen Discharge Chute
WORLD COAL 2013: "Shake Rattle and Roll: Long-Term Corrosion Protection for Vibrating Screen Decks in Coal Handling Preparation Plants."https://arcindustrialcoatings.chesterton.com/ArcDocuments/Shake_Rattle_and_Roll_Long-Term_Corrosion_Protection_for_Vibrating_Screen_Decks_Coal_Handling_Preparation_Plants_World_Coal.pdfWORLD COAL 2013: "Shake Rattle and Roll: Long-Term Corrosion Protection for Vibrating Screen Decks in Coal Handling Preparation Plants."
Improved Methodology to Evaluate Abrasion Resistant Coatingshttps://arcindustrialcoatings.chesterton.com/ArcDocuments/White_Paper_Improved_Methodology_to_Evaluate_Abrasion_Resistant_Coatings.pdfImproved Methodology to Evaluate Abrasion Resistant Coatings

Nominal, based on a 3 mm (120 mil) thickness

  • 0.75 liter kit covers 0.25 m2 (2.69 ft2)
  • 2.5 liter kit covers 0.83 m2 (8.93 ft2)
     
    Note: Components are pre-measured and pre-weighed.
    Each kit includes mixing and application instructions plus tools.

Available Colors

Gray, Red