Skip Navigation LinksARCMX1 ARC MX1

IMMEDIATE SUPPORT (+1) 978 469 6888
  • Tough, ceramic reinforced coating resists broad range of slurries
    • Extends life of equipment exposed to coarse particle wear​​
  • Advanced hybrid polymer matrix
    • Withstands broad pH range
    • Resists repeated high impact force
  • 100% solids; no VOCs; no free isocyanates
    • Enhances safe use
    • Serves demanding applications
  • High tack primer ensures surface bonding
    • Allows for vertical-build capability to most substrates
Pulverizers
Pumps & pipe elbow​​s
Slurry pipelines
Dredge pumps
Fans/blowers/cyclones​​
Fan housings
Hoppers & silos
Slurry pumps
Ceramic tile lined chutes
Conveyor screws
Ceramic tile deflector hoods
Rubber lined deflector hoods
Click Here for Foreign Language Literature

 

 

Product Datasheet - ARC MX1 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/admx1_EN.pdfProduct Datasheet - ARC MX1 (English)
Application Instructions - ARC MX1 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/AI_MX1_EN.pdfApplication Instructions - ARC MX1 (English)
SDS (Part A) - ARC MX1 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/asMX1A_EN.pdfSDS (Part A) - ARC MX1 (English)
SDS (Part B) - ARC MX1 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/asMX1B_EN.pdfSDS (Part B) - ARC MX1 (English)
SDS (Part C) - ARC MX1 (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/asMXC_EN.pdfSDS (Part C) - ARC MX1 (English)

Click Here for Foreign Language Literature

 

 

ARC Case Study 083: Steel Industry - Slag Chutehttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23593.78_ARC-CS083_STEEL-COKING-SINTERING-IRON-MAKING_GRANULATED-SLAG-CHUTE.pdfARC Case Study 083: Steel Industry - Slag Chute
Success Stories - Use of Protective Coatings in Mining (e-book)https://arcindustrialcoatings.chesterton.com/ArcDocuments/36586_Protective Coating_Mining_CS_eBook-FINAL.pdfSuccess Stories - Use of Protective Coatings in Mining (e-book)
ARC Case Study 116 - Mineral-Ore- Transport Auger Screwhttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23606.11_ARC-CS116_MINING-MINERAL-ORE-PROCESSING_TRANSORT-AUGER-SCREW.pdfARC Case Study 116 - Mineral-Ore- Transport Auger Screw
ARC Case Study 118 - Power Fossil - Ash Coneshttps://arcindustrialcoatings.chesterton.com/ArcDocuments/EN23606.13_ARC-CS118_POWER-FOSSIL-ASH-_HANDLING_ASH-CONES.pdfARC Case Study 118 - Power Fossil - Ash Cones
ARC Case Study 142: Mining/Ore Processing - Cyclone Tub Resurfacing (English)https://arcindustrialcoatings.chesterton.com/ArcDocuments/EN36586.01_ARC_CS0142_Mining_Mineral_Ore_Processing_Cyclone Tub Resurfaceing.pdfARC Case Study 142: Mining/Ore Processing - Cyclone Tub Resurfacing (English)

Nominal, based on a 6 mm (240 mil) thickness

  • 6 kg kit covers 0.37 m2 (3.97 ft2)
    Contains:
    - 1 x MXP (primer) part A and B
    - 1 x MX1 (top coat) part A and B
    - 1 x MX (ceramic reinforcement) part C
     
  • 20 kg kit covers 1.23 m2 (13.23 ft2)
    Contains:
    - 1 x MXP (primer) part A and B
    - 1 x MX1 (top coat) part A and B
    - 1 x MX (ceramic reinforcement) part C
     
    Note: Components are pre-me​asured and pre-weighed.
    Each kit includes mixing and application instructions plus tools.

Available Colors

Blue​​
​ ​